The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$94,846,806

National Aeronautics and Space Administration·National Aeronautics and Space Administration

to AMENTUM TECHNOLOGY, INC.

aerospaceexpiring · 78d· period of performance ends in 78 days
ACTION DATE·SOURCEUSASPENDING·SOURCE IDCONT_AWD_NNL17AA43T_8000_NNL13AA14C_8000
Award description

IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 403 (CPFF IDIQ). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER); TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]); RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]); AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT).

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds maintenance, operations, and engineering support for NASA Langley Research Center's institutional and research facilities.

Sub-sectors
research-facilitiesfacility-operationswind-tunnels
Why this matters

Sustains critical aerospace research infrastructure including specialized wind tunnels and test facilities essential for NASA's aeronautics and space missions.

Supply-chain signal

Indicates sustained demand for facility management, engineering services, and specialized technical support contractors supporting government research operations.

U.S.–China competition angle

Maintains U.S. aerospace research capabilities and advanced testing facilities that underpin competitive advantage in aeronautics and space technology development.

Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-14. Cost: $0.001760.

Period of performance
Start
2017-01-26
End
2026-07-31
Status
expiring · 78din 78 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$94.8M National Aeronautics and Space Administration — The Buildout — The Buildout