$195,042,326
to BL HARBERT INTERNATIONAL LLC
DESIGN-BUILD CONSTRUCTION OF CASABLANCA NEW CONSULATE COMPOUND PROJECT IN CASABLANCA, MOROCCO.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Latest obligation on 2019-initiated design-build construction contract for new U.S. consulate compound in Casablanca, Morocco.
$195M diplomatic infrastructure investment in North Africa reflects continued U.S. commitment to regional consular operations.
Consulate construction drives demand for international-standard materials and engineering; supports U.S. design-build firms and Moroccan subcontractors.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-09. Cost: $0.012624.
- 2026-06-03BASE AWARD FOR CONSTRUCTION MANAGER AS CONSTRUCTOR CLIN-001 FOR DESIGN-PHASE SERVICES FOR HANOI NEC.$819.0M
- 2026-04-16BEIRUT, LEBANON NEW EMBASSY CONSTRUCTIONIGF::CL::IGF$732.2M
- 2026-04-08CONSTRUCTION SERVICES FOR THE NEW EMBASSY COMPOUND IN NEW DELHI, INDIA.$685.1M
- 2026-05-14NEC - KINSHASA REPUBLIC OF CONGO$544.7M
- 2026-05-26LILONGWE, MALAWI NEW EMBASSY COMPOUND, DESIGN AND CONSTRUCTION SERVICES.$264.2M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_19AQMM19C0150_1900_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.