The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$34,321,462

Department of Veterans Affairs·Department of Veterans Affairs

to MGC SERVICES A JOINT VENTURE 2 LLC

veteransexpiredONGOING · MOD OF 2021 CONTRACT
WORK BEGAN2021-06-15·LATEST ACTION2026-04-08·SOURCEUSASPENDING·SOURCE IDCONT_AWD_36C10F21C0004_3600_-NONE-_-NONE-
Award description

PHASE 2 EXPANSION OF THE GREAT LAKES NATIONAL CEMETERY

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Phase 2 expansion of Great Lakes National Cemetery (ongoing since 2021), increasing burial capacity for veterans.

Sub-sectors
national-cemeteryfacilities-expansioncapital-project
Why this matters

National cemeteries are a cornerstone veterans' benefit. This Phase 2 expansion addresses growing demand for dignified burial spaces.

Supply-chain signal

Signals sustained demand for construction labor, building materials suppliers, and cemetery maintenance equipment vendors.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-16. Cost: $0.009483.

Period of performance
Start
2021-06-15
End
2026-04-08
Status
expired96 days ago
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$34.3M Department of Veterans Affairs — The Buildout — The Buildout