$36,477,635
to STRIDER CONSTRUCTION CO INC
CONSTRUCTION SERVICES FOR PROJECT OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS. THE WORK CONSISTS OF AGGREGATE BASE TRAIL RECONSTRUCTION, SLOPE STABILIZATION, SLOPE PROTECTION, WALLS (DRY STACK ROCKERY, SOIL NAIL, GABION, MECHANICALLY
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Reconstruct trails and stabilize slopes at Crater Lake, building retaining walls and improving marina infrastructure.
Construction demand for aggregates, soil stabilization materials, retaining wall components, and regional labor.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-15. Cost: $0.009163.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_69056726C000005_6925_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.