The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$36,477,635

Department of Transportation·Federal Highway Administration

to STRIDER CONSTRUCTION CO INC

WORK BEGAN2026-01-23·LATEST ACTION2026-03-27·SOURCEUSASPENDING·SOURCE IDCONT_AWD_69056726C000005_6925_-NONE-_-NONE-
Award description

CONSTRUCTION SERVICES FOR PROJECT OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS. THE WORK CONSISTS OF AGGREGATE BASE TRAIL RECONSTRUCTION, SLOPE STABILIZATION, SLOPE PROTECTION, WALLS (DRY STACK ROCKERY, SOIL NAIL, GABION, MECHANICALLY

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Reconstruct trails and stabilize slopes at Crater Lake, building retaining walls and improving marina infrastructure.

Sub-sectors
fhwa-infrastructurepark-recreationconstruction
Supply-chain signal

Construction demand for aggregates, soil stabilization materials, retaining wall components, and regional labor.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-15. Cost: $0.009163.

Period of performance
Start
2026-01-23
End
2028-10-29
Status
activein 839 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$36.5M Department of Transportation — The Buildout — The Buildout