The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$36,869,023

Department of State·Department of State

to FUTRON, INC.

diplomacyactiveONGOING · MOD OF 2025 CONTRACT
WORK BEGAN2025-02-21·LATEST ACTION2026-03-11·SOURCEUSASPENDING·SOURCE IDCONT_AWD_19AQMM25C0335_1900_-NONE-_-NONE-
Award description

NEW EMBASSY DESIGN BUILD RENOVATION AT US EMBASSY BERN SWITZERLAND.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Design and build renovation of the U.S. Embassy facility in Bern, Switzerland.

Sub-sectors
embassy-infrastructuredesign-build-renovationstate-department-operations
Why this matters

Embassy infrastructure modernization supports diplomatic operations and secure U.S. government presence in a key European financial center.

Supply-chain signal

Signals demand for construction, architectural design, and building systems integration services for federal diplomatic facilities.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.001988.

Period of performance
Start
2025-02-21
End
2028-02-08
Status
activein 630 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$36.9M Department of State — The Buildout — The Buildout