The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$44,366,162

Department of Transportation·Federal Highway Administration

to FORT MYER CONSTRUCTION CORP

WORK BEGAN2025-11-03·LATEST ACTION2026-03-04·SOURCEUSASPENDING·SOURCE IDCONT_AWD_693C7325C000018_6925_-NONE-_-NONE-
Award description

THIS REQUEST FOR PROPOSAL (DESIGN BUILD) FOR GEORGE WASHINGTON MEMORIAL PARKWAY MOUNT VERNON TRAIL RECONSTRUCTION, PROJECT NO. VA NP GWMP MVT(4) LOCATED IN ARLINGTON COUNTY AND THE CITY OF ALEXANDRIA, VIRGINIA AND THE DISTRICT OF COLUMBIA, WASHINGTON

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Reconstruct the Mount Vernon Trail section of George Washington Memorial Parkway through design-build contract.

Sub-sectors
highway-infrastructuredesign-buildtrail-reconstruction
Why this matters

Supports regional transportation and recreation infrastructure resilience in a critical DC-area corridor.

Supply-chain signal

Large construction project will drive demand for construction materials, equipment, and labor in DC region.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-12. Cost: $0.009638.

Period of performance
Start
2025-11-03
End
2029-05-31
Status
activein 1053 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$44.4M Department of Transportation — The Buildout — The Buildout