The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$44,450,173

Department of Transportation·Federal Highway Administration

to H-K CONTRACTORS, INC.

transportationexpiredONGOING · MOD OF 2022 CONTRACT
WORK BEGAN2022-01-31·LATEST ACTION2026-03-06·SOURCEUSASPENDING·SOURCE IDCONT_AWD_69056722F000034_6925_69056719D000006_6925
Award description

WY NPS YELL 10(23), GRAND LOOP ROAD-OLD FAITHFUL TO WEST THUMB

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Construction or repair of Grand Loop Road in Yellowstone National Park from Old Faithful to West Thumb.

Sub-sectors
highway-infrastructurefhwa-contractnational-park-roads
Why this matters

Maintains critical infrastructure in a major national park, supporting tourism economy and visitor safety.

Supply-chain signal

Signals demand for heavy construction materials, equipment, and labor in remote mountain infrastructure projects.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.001979.

Period of performance
Start
2022-01-31
End
2023-11-02
Status
expired929 days ago
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.