$44,450,173
Department of Transportation·Federal Highway Administration
WORK BEGAN2022-01-31·LATEST ACTION2026-03-06·SOURCEUSASPENDING·SOURCE IDCONT_AWD_69056722F000034_6925_69056719D000006_6925
Award description
WY NPS YELL 10(23), GRAND LOOP ROAD-OLD FAITHFUL TO WEST THUMB
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Continued rehabilitation of Yellowstone's Grand Loop Road segment, part of a 2022-started infrastructure project.
Sub-sectors
highway-constructionscenic-road-rehabilitationnps-infrastructure
Why this matters
Yellowstone infrastructure maintenance ensures critical park access and supports the regional tourism economy.
Supply-chain signal
Demand for regional suppliers of asphalt, concrete, heavy equipment rental, and construction labor.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-12. Cost: $0.013108.
Period of performance
Start
2022-01-31
End
2023-11-02
Status
expired984 days ago
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_69056722F000034_6925_69056719D000006_6925.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.