$44,450,173
Department of Transportation·Federal Highway Administration
WORK BEGAN2022-01-31·LATEST ACTION2026-03-06·SOURCEUSASPENDING·SOURCE IDCONT_AWD_69056722F000034_6925_69056719D000006_6925
Award description
WY NPS YELL 10(23), GRAND LOOP ROAD-OLD FAITHFUL TO WEST THUMB
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Construction or repair of Grand Loop Road in Yellowstone National Park from Old Faithful to West Thumb.
Sub-sectors
highway-infrastructurefhwa-contractnational-park-roads
Why this matters
Maintains critical infrastructure in a major national park, supporting tourism economy and visitor safety.
Supply-chain signal
Signals demand for heavy construction materials, equipment, and labor in remote mountain infrastructure projects.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.001979.
Period of performance
Start
2022-01-31
End
2023-11-02
Status
expired929 days ago
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_69056722F000034_6925_69056719D000006_6925.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.