The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$52,344,747

National Aeronautics and Space Administration·National Aeronautics and Space Administration

to THE AEROSPACE CORPORATION

aerospaceactiveONGOING · MOD OF 2024 CONTRACT
WORK BEGAN2024-10-01·LATEST ACTION2026-05-12·SOURCEUSASPENDING·SOURCE IDCONT_AWD_80GSFC24F0033_8000_80GSFC19D0011_8000
Award description

NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS).

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Provides specialized engineering, evaluation, and test services for NASA programs.

Sub-sectors
nasa-systems-engineeringevaluation-services

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-09. Cost: $0.016959.

Period of performance
Start
2024-10-01
End
2028-09-30
Status
activein 810 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$52.3M National Aeronautics and Space Administration — The Buildout — The Buildout