$60,451,294

Department of State·International Boundary and Water Commission: U.S.-Mexico

to PCL CONSTRUCTION INC

environmentactiveONGOING · MOD OF 2024 CONTRACT
WORK BEGAN2024-08-20·LATEST ACTION2026-05-12·SOURCEUSASPENDING·SOURCE IDCONT_AWD_191BWC24C0008_19BM_-NONE-_-NONE-
Award description

INTERNATIONAL WASTEWATER TREATMENT PLANT REHABILITATION AND EXPANSION PROJECT

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Latest obligation on the wastewater treatment rehabilitation project begun in 2024 under the U.S.-Mexico International Boundary and Water Commission.

Sub-sectors
water-infrastructurewastewater-treatmentbinational-cooperation
Why this matters

Binational wastewater infrastructure underpins U.S.-Mexico water security, critical as drought and climate change stress border water supplies.

Supply-chain signal

Drives demand for construction materials (concrete, steel), equipment, and engineering services; likely regional sourcing for border-area infrastructure work.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-07. Cost: $0.012714.

Period of performance
Start
2024-08-20
End
2031-11-12
Status
activein 1948 days