$72,997,302
to AECOM TECHNICAL SERVICES, INC.
LITTLE SCIOTO RIVER TASK ORDER
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Latest obligation on the Little Scioto River cleanup task order, an ongoing EPA environmental remediation project that began in 2023.
The Little Scioto River is a contaminated waterway requiring sustained federal investment; this 2026 modification signals continued commitment to multi-year restoration work.
AECOM's role as prime contractor on this task order sustains demand for environmental engineering, site assessment, and remediation services through 2027.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-02. Cost: $0.002888.
- 2026-03-13REFS/CEIC/INFRASTRUCTURE (I): NEW TASK ORDER (TO) CALLED "PARTNERSHIP FOR GLOBAL INFRASTRUCTURE AND INVESTMENT (PGI) FUND TASK ORDER". THE PGI TO WILL PROVIDE INFRASTRUCTURE PROJECT DESIGN AND DELIVERY SUPPORT, AND ENABLING ENVIRONMENT RE$51.3M
- 2026-04-28VELSICOL DOWNGRADIENT VERTICAL BARRIER WALL IN ST. LOUIS, MI.$38.6M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_68HE0523F0038_6800_68HERH19D0001_6800.