$79,676,344

General Services Administration·Public Buildings Service

to TRANE U.S. INC.

energyactiveONGOING · MOD OF 2016 CONTRACT
WORK BEGAN2016-04-20·LATEST ACTION2026-04-08·SOURCEUSASPENDING·SOURCE IDCONT_AWD_GSP0216PV7171_4740_DEAM3609GO29044_8900
Award description

IGF::OT::IGF FOR OTHER FUNCTIONS GSA R2 2016 NYC ESPC PROJECT FOR 10 FEDERAL BUILDINGS. THE PROJECT CONSISTS OF THE INSTALLATION OF 98 ENERGY AND WATER CONSERVATION MEASURES TOTALING A CONSTRUCTION INVESTMENT VALUE OF $113,161,454 AT THE JACOB JAVITS FEDERAL BUILDING, THE U.S, COURT OF INTERNATIONAL TRADE, THE TED WEISS FEDERAL BUILDING, THE ALEXANDER HAMILTON U.S. CUSTOMS HOUSE, THE DANIEL P. MOYNIHAN FEDERAL COURTHOUSE, THE VARICK STREET FEDERAL BUILDING, THE RONALD BROWN U.S. MISSION TO THE UNITED NATIONS BUILDING, THE THEODORE ROOSEVELT COURTHOUSE, THE EMMANUEL CELLER COURTHOUSE, THE CONRAD DUBERSTEIN FEDERAL COURTHOUSE AND THE CHARLES BRIEANT FEDERAL COURTHOUSE. THESE IMPROVEMENTS ARE PROPOSED TO BE PRIVATELY FINANCED BY TRANE FOR 18 YEARS AT AN INTEREST RATE OF 3.44%, AND ARE TO BE PAID FROM ENERGY SAVINGS GUARANTEED EACH YEAR OVER THE 18-YEAR LOAN TERM. THE TOTAL COST OF THIS CONTRACT TO THE GOVERNMENT WILL BE $180,619,943 OVER THE 18-YEAR LOAN TERM.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Finance installation of 98 energy and water conservation measures across 10 NYC federal buildings through an 18-year energy savings performance contract.

Sub-sectors
energy-efficiencyespc-financingfederal-buildings
Why this matters

Demonstrates federal commitment to reducing building energy consumption and operational costs through private financing tied to guaranteed energy savings.

Supply-chain signal

Signals demand for HVAC, lighting, controls, and water conservation equipment suppliers serving large commercial retrofit projects.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002379.

Period of performance
Start
2016-04-20
End
2036-06-30
Status
activein 3696 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.