The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$108,991,096

Department of the Interior·Bureau of Reclamation

to KREW HEAVY CIVIL LLC

environmentexpiredONGOING · MOD OF 2018 CONTRACT
WORK BEGAN2018-09-20·LATEST ACTION2026-04-02·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140R6018C0015_1425_-NONE-_-NONE-
Award description

IGF::CT::IGF - BULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Latest obligation on the Bull Lake Dam spillway modifications project in Wyoming, which began in 2018.

Sub-sectors
water-infrastructuredam-safetyreclamation
Why this matters

Spillway upgrades are critical for dam safety and flood risk management across the Pick-Sloan Missouri Basin Program.

Supply-chain signal

Heavy civil construction work signals demand for concrete, steel, and specialized dam-engineering contractors in the region.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-27. Cost: $0.002725.

Period of performance
Start
2018-09-20
End
2024-09-16
Status
expired665 days ago
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$109.0M Department of the Interior — The Buildout — The Buildout