The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$144,045,451

Department of Health and Human Services·National Institutes of Health

to HENSEL PHELPS CONSTRUCTION CO

healthactiveONGOING · MOD OF 2024 CONTRACT
WORK BEGAN2024-09-30·LATEST ACTION2026-04-03·SOURCEUSASPENDING·SOURCE IDCONT_AWD_75N99024F00003_7529_75N99019D00016_7529
Award description

ADDITIONAL FUNDS TO REQ #7011484 - C107641 POOLESVILLE A&B CONVERSION DESIGN-BUILD CONTRACT, BLDG 102, JOSE MOREL LOPEZ [24-005745]

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Additional funding for the ongoing Poolesville Building 102 design-build conversion project at NIH, started in 2024.

Sub-sectors
nih-facilitiesconstruction-modificationbuilding-infrastructure
Why this matters

NIH facility modernization supports research infrastructure capacity; cost growth or scope changes on multi-year projects signal budget pressures.

Supply-chain signal

Hensel Phelps construction activity indicates sustained demand for design-build contractors in federal biomedical research facility upgrades.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-24. Cost: $0.002801.

Period of performance
Start
2024-09-30
End
2028-12-20
Status
activein 891 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$144.0M Department of Health and Human Services — The Buildout — The Buildout