The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$156,779,591

Department of Homeland Security·U.S. Customs and Border Protection

to BCCG A JOINT VENTURE

justiceactiveONGOING · MOD OF 2025 CONTRACT
WORK BEGAN2025-09-15·LATEST ACTION2026-03-30·SOURCEUSASPENDING·SOURCE IDCONT_AWD_70B01C25F00000986_7014_70B01C23D00000009_7014
Award description

DESIGN AND CONSTRUCTION OF NEW VERTICAL BARRIER AND POWER DISTRIBUTION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Design and construction of new vertical barrier and power distribution infrastructure for U.S. Customs and Border Protection.

Sub-sectors
border-securitycbp-infrastructurebarrier-construction
Why this matters

Part of ongoing border security modernization; represents sustained federal investment in physical barrier and electrical systems along U.S. borders.

Supply-chain signal

Drives demand for steel barrier materials, electrical components, and construction labor; supports domestic construction and manufacturing supply chains.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-23. Cost: $0.002723.

Period of performance
Start
2025-09-15
End
2028-04-11
Status
activein 638 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$156.8M Department of Homeland Security — The Buildout — The Buildout