The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$48,511,618

Department of Transportation·Federal Highway Administration

to COLORADO DEPARTMENT OF TRANSPORTATION

WORK BEGAN·LATEST ACTION·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22230000Y001COSW00985_069
Award description

PROJECT TITLE: FASTER CBE BABS 2010 DEBT SVC - NHS :::: PROJECT DESCRIPTION: FASTER CBE BABS 2010 DEBT SVC - NHS-DEBT SERVICE BRIDGE ENTERPRISE NHS STRUCTURES-POOR BRIDGE STRUCTURES REHAB, RECONSTRUCTION AND REPLACEMENT

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds debt service and bridge rehabilitation on the National Highway System in Colorado through the FASTER program.

Sub-sectors
highway-infrastructurebridge-rehabilitationdebt-service
Why this matters

Maintains critical highway infrastructure and manages bonded debt obligations for bridge reconstruction on major routes.

Supply-chain signal

Drives demand for construction materials, engineering services, and bridge repair contractors in Colorado's transportation sector.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.001996.

Period of performance
Start
End
2043-01-30
Status
activein 6100 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.