The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$50,586,102

Department of Transportation·Federal Highway Administration

to PENNSYLVANIA DEPARTMENT OF TRANSPORTATION

ACTION DATE·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22430000Y001PAT111225_069
Award description

PROJECT TITLE: I-376, COMMERCIAL STREET BRIDGE :::: PROJECT DESCRIPTION: REPLACEMENT OF THE I-376 COMMERCIAL STREET BRIDGE ALONG THE PARKWAY EAST WITHIN THE CITY OF PITTSBURGH, ALLEGHENY COUNTY FOR THE BRIDGE REPLACEMENT, NEW SIGN STRUCTURES, NEW RETAINING WALL, PAVEMENT RECONSTRUCTION, ASPHALT MILLING AND RESURFACING, GUIDE RAIL UPDATES, MEDIAN BARRIER REPLACEMENT, DRAINAGE, SIGNING AND PAVEMENT MARKING, RAMP LOWERING, TEMPORARY ROADWAY, TEMPORARY TRAIL, SEWER LINE RELOCATION, LANDSCAPING, ITS UPGRADES, OVER HEIGHT TRUCK DETECTION SYSTEM RELOCATION, AND OTHER MISCELLANEOUS CONSTRUCTION, ALL WITHIN A LENGTH OF 5493.50 LINEAR FEET (1.041 MILES) AS INDICATED ON THE APPROVED DRAWINGS INCLUDED IN THE BID PACKAGE FOR STATE ROUTE 376, SECTION A62 AND STATE ROUTE 8012, SECTION A02, IN ALLEGHENY COUNTY, CITY OF PITTSBURGH, WILKINSBURG AND CHURCHILL BOROUGHS, COMMONWEALTH OF PENNSYLVANIA. THIS PROJECT BEING SITUATED AS FOLLOWS: SR 376-A62: FROM APPROXIMATELY THE EASTERN PORTAL OF THE SQUIRREL HILL TUNNEL AT SEGMENTS 0751 WB/0750 EB, OFFSETS 0161 WB/0166 EB (STATIONS 913+90 WB/913+85 EB) TO APPROXIMATELY 3,600 FEET WEST OF THE BRADDOCK AVENUE INTERCHANGE AT SEGMENT 0755 WB/0754 EB, OFFSET 1260 WB/EB (STATIONS 1935+54 WB/EB). SR 8012-A02: FROM APPROXIMATELY 650 FEET NORTH OF ARDMORE BOULEVARD (SR 8) AT SEGMENT 0500, OFFSET 1875 (STATION 20+85) TO APPROXIMATELY SR 376 AT SEGMENT 0500, OFFSET 0308 (STATION 36+52).

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Replacement and reconstruction of the I-376 Commercial Street Bridge in Pittsburgh, including structural, drainage, and safety upgrades.

Sub-sectors
highway-infrastructurebridge-replacementfhwa-formula-grant
Why this matters

Critical infrastructure renewal on a major regional corridor (Parkway East) serving Pittsburgh metropolitan area commerce and commuter traffic.

Supply-chain signal

Demand for bridge construction materials, steel, concrete, signage systems, and traffic control equipment from regional and national suppliers.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002542.

Period of performance
Start
End
2028-12-14
Status
activein 942 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.